Security
Genuine-hardware sourcing check
Build a sourcing evidence file for each hardware lot. Track documentation, flag concerns, follow manufacturer verification routes and export an action report.
Open toolCheck lifecycle dates and work through networking, storage, compute, power and AV decisions. Inspect the calculations, compare requirements and find the next step.
68 tools for the details that matter
Start a connected plan
Run a calculation, inspect the assumptions, then carry the plan into the next decision.
Security
Build a sourcing evidence file for each hardware lot. Track documentation, flag concerns, follow manufacturer verification routes and export an action report.
Open toolSecurity
Build a camera and access-control plan. Calculate recording storage, peak bandwidth, PoE and equipment counts, then export the bill of materials for review.
Open toolSecurity
Count primary/recovery authenticators, stock and enrollment effort under an explicit rollout policy.
Open toolSecurity
Calculate a rectilinear target-plane view from documented FOV or actual active sensor dimensions.
Open toolSecurity
Trace an IPv4 packet through ordered rules and identify rules fully covered by an earlier entry.
Open toolSecurity
Check a bounded record syntax subset and expose unresolved SPF lookup expansion without probing DNS.
Open toolSecurity
Check throughput, connection setup and concurrent sessions against one explicitly entered measured feature profile.
Open toolSecurity
Translate EPS and event size into stored retention volume with separate indexing, compression, replication and free-space assumptions.
Open toolSecurity
Compare supplied validity dates against a reference clock and signed device-clock offset.
Open toolSecurity
Evaluate an offline first-match identity/resource scenario while preserving unknown MFA or device evidence.
Open toolPower & racks
Size a UPS from your real load in watts — apparent power, headroom and the standard class it lands in — then filter live UPS systems by capacity, form factor and voltage.
Open toolPower & racks
Narrow thousands of live rack PDUs by outlet count, C13 and C19 receptacles, amperage, voltage, 0U or 1U/2U form, and basic, metered or switched control.
Open toolPower & racks
Build a PoE device list with manual watts or catalog models. Calculate switch-side power and port requirements, then compare PSU failover scenarios.
Open toolPower & racks
Add configuration-specific AC loads, then calculate heat and an editable energy-cost scenario.
Open toolPower & racks
Check a new device against separately entered height, envelope, mounting distance and load limits.
Open toolCompute & memory
Search the OEM memory part number your system takes and see the modules whose manufacturer states compatibility with it — or filter by DDR generation, capacity, form factor and ECC.
2 connected worksheets
Open toolCompute & memory
Configure a UniQ research workstation — platform, graphics, memory, storage and operating system — and send the build to our team for a quoted specification.
2 connected worksheets
Open toolCompute & memory
Estimate model weights, KV cache and runtime memory for an AI workload. Keep GPU VRAM and unified system memory separate, with documented assumptions and sources.
Open toolCompute & memory
Calculate a Gen1–5 one-direction line payload bound and compare requested lanes with an entered platform budget.
Open toolCompute & memory
Compare configured VM memory and an explicit vCPU policy with surviving hosts, without predicting application performance.
Open toolCompute & memory
Estimate raw vector bytes and a documented Faiss HNSW footprint with explicit metadata, IDs, runtime and copies.
Open toolCompute & memory
Model sequential and parallel retrieval stages, first-token time and the remaining generated-token stream.
Open toolNetworking
How far Cat5e, Cat6, Cat6a, OM3/OM4 fiber, DAC and AOC actually reach at 1G through 100G — with a link planner that filters our stocked cables to the run you measured.
2 connected worksheets
Open toolNetworking
Plan a direct or switched DGX Spark link, then filter QSFP listings by cable length, rated speed and straight or breakout connector layout.
Open toolNetworking
Describe the building — size, floors, cameras, doors — and get a sized Ubiquiti UniFi bill of materials with live pricing and honest availability, ready to add to a cart or send for a quote.
2 connected worksheets
Open toolNetworking
Check worst-case receive sensitivity and receiver overload using explicit optic and plant limits.
Open toolNetworking
Compare nominal rates, media and crossed wavelengths while keeping exact host support explicit.
2 connected worksheets
Open toolNetworking
Compare entered bidirectional measurements with project limits and track inspection and test prerequisites.
Open toolNetworking
Separate access line rate, concurrent demand, aggregate uplinks and the single-member flow ceiling.
Open toolNetworking
Convert byte cache-hit ratio into origin link demand with explicit fill, background and reserve allowances.
Open toolNetworking
Normalize a prefix and allocate aligned LAN, /31 point-to-point and /32 host requests inside it.
Open toolNetworking
Model positive and negative TTL remnants and inspect a supplied DNS record set for bounded local conflicts.
Open toolNetworking
Separate round-trip propagation floor from entered queueing and application processing allowances.
Open toolNetworking
Translate line speed and MAC frame size into one-way packets per second with Ethernet wire overhead.
Open toolNetworking
Explore a serial HTTP latency budget across DNS, connection establishment, dependent requests, server work and body transfer.
Open toolNetworking
Check surviving pool capacity against request rate and concurrency under explicit node-loss and utilization assumptions.
Open toolNetworking
Subtract explicitly entered encapsulation and distinguish base-header TCP MSS from actual data space with options.
Open toolNetworking
Compare group-aware multicast, flooding and unicast copies on one specified link.
Open toolNetworking
Budget active and post-close held mappings against an explicit public-address and port pool.
Open toolNetworking
Compute in-flight data, a receive-window throughput ceiling and explicit exponential timeout waits.
Open toolNetworking
Account for packetization and RTP/UDP/IP/Ethernet overhead while keeping full-duplex directional capacity separate.
Open toolNetworking
Compare free-space receive margin, obstacle-position Fresnel clearance and an explicitly supplied EIRP limit.
Open toolAV & workplace
Calculate label web and ribbon quantities, dot size and the physical limits entered for a printer.
Open toolAV & workplace
Estimate nominal battery energy, an ideal charging minimum and whether the device count fits the entered bay count.
Open toolAV & workplace
Compare an explicit pixel-clock or active-pixel lower bound with a documented link payload budget.
Open toolAV & workplace
Intersect documented display transports, count display paths and budget shared USB-C charging power.
Open toolAV & workplace
Separate audio transport, remote call control and adapter evidence while counting deployment units.
Open toolAV & workplace
Count complete video/USB paths and compare entered KVM, host and display capability evidence.
Open toolAV & workplace
Check entered VESA, bare-display mass and desk-thickness limits independently.
Open toolAV & workplace
Compare two displays by pixel density, active dimensions and approximate logical workspace at an entered scale.
Open toolAV & workplace
Compare declared-yield supply costs with a page mix, per-job duplex paper use and explicit ownership costs.
Open toolAV & workplace
Find a lens-distance range from image width and a documented throw-ratio range.
Open toolAV & workplace
Keep physical tile geometry, pixel canvas, outputs and installation loads in separate ledgers.
Open toolOperations
Use observed repair arrivals and turnaround to size an average in-repair pool and an explicit spare policy.
Open toolOperations
Calculate a time-based downtime budget and optional declared dependency scenarios.
Open toolOperations
Compare explicit transfer, request and local-cost assumptions without presenting a live quote.
Open toolOperations
Estimate worst-direction clock drift from oscillator ppm, starting error and an elapsed holdover period.
Open toolOperations
Estimate request/response traffic, batching and a timeout-only cycle budget from an explicit polling workload.
Open toolStorage
Check entered drive length, key, protocol and thickness without assuming a matching connector proves host support.
Open toolStorage
Compare payload, sustained bottlenecks and additional stages with an explicit time window.
Open toolStorage
Compare equal-drive conventional RAID capacity, hot spares and an explicitly unused share.
2 connected worksheets
Open toolStorage
Use entered average and peak camera bitrates to plan recording traffic and retained usable storage.
Open toolStorage
Convert a documented SSD write rating and compare it with an explicit host-write workload.
Open toolLifecycle
Look up HPE and Aruba end-of-sale and end-of-support dates — ProLiant servers, Aruba switches and access points — with replacement paths and refresh quotes.
Open toolLifecycle
Look up Dell and Dell EMC end-of-life and end-of-service-life dates — PowerEdge servers, networking and storage — with replacement paths and refresh quotes.
Open toolLifecycle
Look up Juniper end-of-sale and end-of-support dates — EX switches, SRX firewalls, MX routers — with vendor-named replacements and refresh quotes.
Open toolLifecycle
Look up Fortinet end-of-order and end-of-support dates — FortiGate, FortiSwitch, FortiAP, FortiManager and FortiAnalyzer hardware — and quote the refresh.
Open toolLifecycle
Look up Palo Alto Networks end-of-sale and end-of-life dates — PA-Series firewalls, Panorama, WildFire and ION appliances — with the vendor-named replacement.
Open toolShare the models, quantities and site requirements. We can help scope hardware, licensing and deployment, with TAA verified on request.