
- Environment
- Job sites, yards & trailers
- Uptime demand
- Phase-to-phase site churn
- Oversight
- Site-security & owner review
- Documentation
- Asset-tracking & redeployment records
A network that moves as fast as the site does
A job site has no wiring closet, no fixed footprint and a crew that turns over every phase — by the time infrastructure is installed the way a permanent office would install it, the site has already moved on. Uniqcli sources and stages rapid-deploy networking, rugged field devices, surveillance and asset tracking built for exactly that churn, from groundbreaking to final walkthrough.
Stood up fast, torn down clean
We kit temporary site networks around LTE/5G backhaul and rapid-deploy wireless so connectivity is live before the trailers are, and we design the kit to be redeployed to the next site rather than scrapped at project close.
Rugged tablets and field laptops, site cameras and access control, and asset-tracking hardware for tools and equipment round out the package — sourced and staged together so a super doesn't have to manage four separate vendors to open a site.
- Rapid-deploy site networking with LTE/5G backhaul
- Rugged tablets and field laptops built for weather and drops
- Site surveillance and access control for perimeter and trailer security
- Asset tracking for tools, equipment and material across yards and sites

Hardware we field here.
Representative platforms from the live Uniqcli catalog — sourced through authorized distribution and TAA-screened per line before they ship.
PanasonicPanasonic TOUGHBOOK FZ-40 FZ-40GCAAFBM 14" Touchscreen Rugged Notebook
Zebra TechnologiesZebra XPAD L10ax Rugged Tablet
Ericsson (Cradlepoint)Cradlepoint E3000 5G Wi-Fi 6 Enterprise Branch Router
PelicanPelican Air Case 1600 Shipping Case
Wilson ElectronicsWilsonPro 460153 Cellular Phone Signal Booster
EatonTripp Lite by Eaton 8-Port Unmanaged Industrial Gigabit Ethernet Switch






Trademarks belong to their respective owners. Availability through authorized distribution.
Purpose-built for the sector
- Rapid-deploy networking with LTE/5G backhaul, live before trailers arrive
- Rugged tablets and field laptops rated for weather, dust and drops
- Site surveillance and access control for perimeter and equipment security
- Asset tracking across yards, sites and multiple active projects
- Kitted equipment designed for redeployment site to site
- Quotes scoped per project and formatted for your procurement review
- From trailers landing to a live site network
- Days
- Site surveillance and access-control coverage
- 24/7
Capabilities we scope alongside
The mission lanes most often paired with programs in this sector — sourced, integrated and delivered by one accountable partner.
Telecom
Carrier-grade routing, optical transport, switching and secure communications infrastructure.
Access Control & Physical Security
Credentialing, door hardware, video surveillance and integrated facility security systems.
Logistics & Lifecycle
TAA-compliant supply chain, warehousing, staging, white-glove delivery and asset lifecycle management.
The kit list for a connected job site
- LTE/5G failover routers for trailer and site-office connectivity
- MIL-STD-810-tested rugged tablets for field supervision
- Point-to-point wireless bridges for laydown-yard and crane-camera links
- IP66/IP67 PoE cameras for perimeter and equipment surveillance
- Solar- and battery-powered mobile surveillance units for unpowered phases
- Badge readers and turnstiles for site access control
- BLE and GPS asset trackers for tools and heavy equipment
- LEO satellite backhaul for sites beyond reliable cellular coverage
- Weatherproof network enclosures and UPS for trailer racks
- TAA-compliant rugged laptops for federally funded projects
Sector posture
What travels with the quote.
The posture is the same in every sector — assembled while the quote is built, not reconstructed once an order is placed. What was sourced, where it came from, who touched it and when it shipped.
- TAA-compliant sourcing under FAR 52.225-5, verified by country of origin
- NDAA §889 covered-equipment screening on every line item
- Chain-of-custody and asset-tag documentation on delivery
- US-based integration, staging and white-glove logistics through our distribution and partner network
- Documentation formatted for site-security & owner review
Frequently asked
How fast can a temporary site network go live?
Once we confirm hardware availability and site LTE/5G coverage, kits ship ready to deploy — most sites are live within days of trailers landing, not weeks.
Can the same networking kit move with us to the next site?
Yes. We spec kits for redeployment rather than one-time use, so equipment from a completed site can be restaged for the next one instead of being surplused.
Do you supply asset tracking for tools and equipment, not just network gear?
Yes. We source tracking hardware for tools, equipment and material alongside the networking package, so yard and site inventory can be managed under one procurement.
What IP and MIL-STD ratings should we require in field tablets and laptops?
Read the two systems separately. An IP rating's first digit is solids — 6 means dust-tight — and the second is water, where 5 covers jets and 7 covers temporary immersion, so IP65 to IP68 is the usual job-site range. MIL-STD-810 is a set of test methods, not a certification with a governing body, so ask which methods a device was actually tested against — drop height, vibration, operating temperature — rather than accepting the label alone.
Our project is federally funded — can you document country of origin for Buy American review?
Yes. We screen and record country of origin per line item before quoting, and flag anything against the NDAA Section 889 covered-entity restrictions that apply to federally funded work — which matters most for site cameras and cellular equipment. The compliance determination itself stays with your contracting officer or compliance team; what we provide is the per-item documentation that lets them make it without chasing manufacturers for letters.
Can public-works and school construction projects buy through a cooperative contract or an agency-held vehicle?
We support purchases that ride vehicles the buyer or their agency already holds — state term contracts, cooperative purchasing agreements, or a public owner's existing IT contract — by formatting quotes and documentation the way that vehicle's ordering process expects. Tell us which one applies at the quoting stage and the paperwork is built for it from the start.
Can quotes and invoices be split per project or cost code?
Yes. General contractors rarely want one blended invoice across active jobs, so we quote per-site bills of materials — one per project, phase or cost code — and ship and invoice against them separately, even when the underlying kit is identical. That keeps each job's technology spend inside its own budget line and makes closeout reconciliation a matter of matching one BOM to one project instead of allocating a lump sum afterward.
Every sector
One method, every operating environment.
Government & Public Sector
Infrastructure & Energy
Industrial & Manufacturing
Enterprise & Institutions
Scope a construction requirement
Describe the mission — we'll come back with an approach, lead time and TAA-verified pricing.