Metered rack PDUs
Rack PDUs that report what the rack is actually drawing — filter by outlet count, rated amperage, voltage and rack form, or search inside the page.
Showing 24 of 1,720 metered PDUs
- EatonTripp Lite by Eaton PDU 3.7kW 208/230V Single-Phase Local Metered PDU - 8 C13 & 2 C19 Outlets L6-20P Input 6 ft. Cord 1U TAA - Metered - NEMA L6-20P - 8 x IEC 60320 C13, 2 x IEC 60320 C19 - 230 V AC - 1U - Horizontal/Vertical - Wall-mountable, Rack-mountable - TAA CompliantPDUMH20HVL66
$334.00
$215.10
196 in stock - EatonTripp Lite by Eaton PDU 3.7kW Single-Phase 208/230V Monitored PDU - LX Platform 20 C13 4 C19 Outlets C20 Input with L6-20P Adapter 0U 1778mm Height TAA - Monitored - 20 x IEC 60320 C13, 4 x IEC 60320 C19 - 230 V AC - Network (RJ-45) - 0U - Vertical - MountRack-mountable - TAA CompliantPDUMNV20HVLX
$871.00
$543.23
138 in stock - EatonTripp Lite by Eaton PDU 1.5kW Single-Phase Local Metered PDU + ISOBAR Surge Suppression 3840 Joules 100-127V Outlets (14 5-15R) 5-15P 15 ft. (4.57 m) Cord 1U Rack-Mount - NEMA 5-15P - 14 x NEMA 5-15R - 120 V AC - 1440 W - 1U - Vertical - Wall-mountable, Rack-mountablePDUMH15-ISO
$347.00
$223.48
112 in stock - StarTech.comStarTech 12-Outlet Horizontal Rack Mount Metered PDU, 1U Server Power Strip w/Surge Protector, 125V/15A, 8ft (2.4m) Power Cord, TAA - 1U rack mount metered PDU w/12x NEMA 5-15R outlets; 125V max; 8ft power cord - Backlit LCD for real-time electrical monitoring (V/A/W/PF) - Self-tripped MOV surge protector; Resettable 15A breaker - Rackmount power distribution strip for server; TAA12NM8-RACK-MOUNT-PDU
$148.61
$143.71
313 in stock - StarTech.comStarTech 16-Outlet Horizontal Rack Mount Metered PDU, 1U Server Power Strip w/Surge Protector, 125V/15A, 8ft (2.4m) Power Cord, TAA - 1U rack mount metered PDU w/16x NEMA 5-15R outlets; 125V max; 8ft power cord - Backlit LCD for real-time electrical monitoring (V/A/W/PF) - Self-tripped MOV surge protector; Resettable 15A breaker - Rackmount power distribution strip for server; TAA16NM8-RACK-MOUNT-PDU
$166.04
$157.90
618 in stock - StarTech.comStarTech 8-Outlet Horizontal Rack Mount PDU, 1U Server Power Distribution Strip w/Surge Protector, 125V/15A, 8ft/2.4m Power Cord, TAA - 1U rack mount metered PDU w/8x NEMA 5-15R outlets; 125V max; 8ft power cord - Backlit LCD for real-time electrical monitoring (V/A/W/PF) - Self-tripped MOV surge protector; Resettable 15A breaker - Rackmount power distribution strip for server; TAA8NM8-RACK-MOUNT-PDU
$130.16
$124.57
1,177 in stock - CyberPower SystemsCyberPower PDU15MHVIEC8FNET 200 - 240 VAC 15A Monitored PDU - 8 Outlets, 10 ft, IEC-320 C14, Horizontal, 1U, SNMP, 3YR WarrantyPDU15MHVIEC8FNET
$319.00
$248.07
3 in stock
Specifications are read from the manufacturer product title as supplied to us; where a value is not stated it is left blank rather than estimated. Every line is screened for TAA country-of-origin and NDAA §889 status before checkout.
About metered PDUs
A metered PDU answers the question a basic strip cannot: how much of this circuit is already spoken for. That matters because the honest capacity of a branch circuit is 80% of its nameplate rating for a continuous load — 16 A on a 20 A feed, 24 A on a 30 A feed — and the only way to know where you stand against that number is to measure it. Nameplate figures on the equipment are worst-case and consistently overstate real draw, so racks planned on paper end up either half empty or one power supply away from tripping a breaker nobody can reset remotely. A metered unit replaces both outcomes with a reading, and a networked one turns that reading into a trend you can plan against.
The depth of metering varies more than the word suggests, and the manufacturer's title rarely distinguishes it: some units meter the whole inlet, some meter each bank, and outlet-level models report every receptacle individually — which is what per-team or per-tenant chargeback needs. Vendors also split the word itself, calling a unit with a local current display metered and one that reports over the network monitored; this page's scope covers both spellings because they describe one tier. What it cannot cover is a unit whose title says only that it is managed — that states no tier the catalog can read, so those rows sit out this page and are best found on the PDU selector, where nothing is locked. As everywhere on the site, each card's specifications are read from the manufacturer's own title and a value that was not stated is left blank.
FAQ
metered PDUs questions
- What does a metered PDU measure?
- At minimum the current drawn through the inlet, shown on a local display. More capable units meter each bank separately, and outlet-metered models report every receptacle individually. Networked models publish current, voltage, kilowatt-hours and often power factor over SNMP or a web interface so the figures can be trended and alarmed. Which level a specific model provides is on its product page — the title usually says no more than metered.
- What is the difference between metered and monitored?
- In practice they name the same tier, and different manufacturers pick different words. Where there is a distinction, metered tends to mean a unit with a local display and monitored one that reports over the network. Because both words describe measurement without switching, this page includes both — check the product page for whether the model you want carries a network port.
- Do I need metering if I already know what my equipment draws?
- Nameplate ratings are worst-case figures for a fully populated, fully loaded chassis, and real draw is usually well below them. Planning from nameplates leaves capacity stranded; planning from optimistic estimates trips breakers. Measurement is what lets you load a circuit to the 80% continuous limit on purpose — and it is the record you need when someone asks why the rack cannot take another host.
- Metered or switched?
- Metered tells you what is happening; switched also lets you do something about it from a distance. If the value you want is capacity planning and a bill you can defend, metered is the cheaper answer. If you also need to power-cycle a hung device without a site visit, or bring a rack up in sequence after an outage, that is the switched page.
Standardising on one PDU?
Send the circuit spec and the rack count. We quote the exact model across the quantity, confirm current stock and hold the price for the quote period — and flag it if a close alternative ships sooner.