Uniqcli

Solutions

PoE Network Infrastructure

Cameras, access points, phones, door controllers and sensors all draw from one power budget, and that budget is usually the last number anyone checks. We total it honestly from your device list before quoting the switching, the injectors and the UPS that has to carry it through an outage.

Scope
PoE switching, injectors, midspans and power headroom
Standards
802.3af, 802.3at and 802.3bt device classes
Boundary
We total the budget from the device list you confirm
Overview

One budget, four departments drawing on it

Power over Ethernet quietly became the shared utility of the building. Physical security hangs cameras off it, facilities hangs access control and sensors off it, IT hangs access points and phones off it, and each of those projects was budgeted separately. The switch in the middle has a single total power budget, and it does not care which department last added a device. A switch can have forty-eight PoE ports and a budget that cannot drive them all at class maximum — which is why the useful question is never "how many PoE ports" but "how many watts, at what class, with what headroom, and what happens when the power fails".

Method

How the budget gets totalled

We start from a device list, not a port count: what is being powered, how many of each, and what class each device negotiates. Class matters more than the marketing wattage — a device that advertises a peak draw usually negotiates a class, and the switch reserves against the class. Then we add the devices that are already installed but were never on anyone's list, because those are the ones that turn a comfortable budget into an over-subscribed one.

Headroom is a decision, not a constant. A closet that will take another camera run next year is sized differently from one that is finished. We ask which it is, quote to that, and write the assumption on the quote so the next person can see what the number was based on.

Where the total lands close to a chassis boundary, we say so and price both sides of it — a second smaller switch is sometimes cheaper and always more resilient than a single unit running at the edge of its supply.

What to send

Everything we need to total a floor

  • Device list by type and count — cameras, APs, phones, door controllers, sensors, clocks
  • Class or model per device type, where you have it (we can look up the common ones)
  • Existing switch models and their current PoE budgets, if this is a retrofit
  • Run lengths that exceed 100 m or pass through unconditioned space
  • Runtime you need from the closet UPS when the power drops
  • Whether the closet is finished or expected to grow — headroom is priced, not assumed
Questions

PoE budget questions

Will a 48-port PoE switch power 48 devices?

Only if the total power budget covers the summed class draw of everything connected. Port count and power budget are separate specifications, and plenty of switches have more ports than watts. Send the device list and we confirm the budget against it before you order.

Do we need 802.3bt, or is 802.3at enough?

It depends entirely on the devices. Most access points and cameras are comfortable on 802.3at; pan-tilt-zoom cameras with heaters, high-density Wi-Fi 7 access points, and some displays and door hardware are the ones that push into 802.3bt. We quote to the device list rather than defaulting to the higher standard and charging you for it.

Can you power devices the switch cannot reach?

Injectors, midspans and extenders cover most of those cases, and are frequently cheaper than moving the closet. Beyond the standard copper distance the answer stops being PoE and becomes a cabling or fiber question, which we quote in the same document.

Does the closet UPS need to change when we add PoE?

Usually yes, and it is the step most often skipped. Once cameras and access control draw their power from the switch, the closet UPS is carrying loads that used to have their own supplies. We size it to the runtime you specify and quote batteries as a lifecycle line rather than a one-time item.

Ask AI about Uniqcli

PoE Network Infrastructure

Send the device list and we'll total the budget

We return the PoE switching, injectors and UPS backing sized to the devices you actually have — the budget figure stated on the quote, availability per line, TAA and §889 screening performed before it goes out.