Data Center Migration & Relocation

Relocations are won on the boring parts — rack maps, cable schedules, spares, labeled crates. We supply the new racking, power, cabling and replacement gear, staged in the order it will be installed.

What we supply
Racking, power, cabling, optics and replacement gear
Staged
Crated and labeled in installation order
Spares
Quoted up front, because the move is when you need them
Boundary
The physical move is executed by your movers and staff
Overview

The interesting problems are solved months before the trucks arrive

A relocation is not a technical challenge so much as an inventory-and-labeling one. What goes in which rack, at which unit height, on which circuit, cabled to which port, in what order, with which spares on hand when a rail kit turns out not to fit or a cable is four feet short. Every one of those is answerable in advance, and every one of them is a purchasable line. We supply the new racking, containment, power distribution, cabling and optics, plus the replacement gear that a relocation always turns out to need, staged and crated in the sequence the installation will follow.

Preparation

What gets decided before anything moves

Each of these is a document, and each of them is also a bill of materials.

  • Rack map: what lands where, at which unit height, in the destination hall
  • Circuit plan: which PDU, which receptacle, matched to the equipment's plugs
  • Cable schedule: length, type and route, so nothing is cut on the night
  • Optics list: transceiver types per link, with the spares on the same order
  • Spares kit: rails, cage nuts, cables, optics — the failures that stall a move
  • Crate and label plan, sequenced to the installation order rather than to the pack list
Boundary

Who does what on the night

Uniqcli supplies and stages equipment. We do not operate a data center, do not perform the physical move, and do not provide the riggers, the trucks or the on-site labor that lifts equipment out of one hall and into another. Those come from your facilities organization or a specialist relocation firm.

What we can do is capability-level and useful: configuration and imaging of replacement gear, racking and labeling to your elevation, kitting and crating in installation order, and delivery sequenced to the move calendar so nothing arrives three weeks early into a hall that is not ready for it.

Country of origin is recorded per line and NDAA §889 screening runs before the quote goes out, on new equipment and replacements alike.

Questions

Relocation questions

Do you move the equipment?

No. The physical move — rigging, transport, lifting and on-site labor — is executed by your facilities team or a specialist relocation firm. We supply and stage the new racking, power, cabling, optics and replacement equipment, sequenced to their schedule.

How far ahead should the hardware be ordered?

Far enough that the long-lead lines are not on the critical path — which for racking, power distribution and some optics can be months rather than weeks. Send the rack map early and we will flag which lines drive the date.

What should be in the spares kit?

Rails, cage nuts, patch cables in the lengths your schedule uses, transceivers matching each link type, and power cords. They are individually cheap and collectively the difference between finishing a move on schedule and stopping at two in the morning.

Procurement

Crated in installation order, labeled to the rack map.

Racking, power distribution, cabling, optics and replacement equipment quoted as one bill of materials and staged to your move calendar.

Ask AI about Uniqcli

Data Center Migration & Relocation

Send the rack map and the move date

We return the destination hall's physical layer as one bill of materials, with long-lead items flagged and a crate-and-label plan attached.