Every migration leaves a hardware residue — edge gateways, refreshed WAN, staging storage, replacement endpoints. We quote and stage that layer so the cutover date is not gated on procurement.

- Scope
- The hardware layer a migration consumes
- Lead time
- Stated per line before you commit
- Staging
- Configured, imaged and labeled to your site plan
- Boundary
- We supply and stage; we do not execute the migration
The cutover date slips on lead times, not on architecture
Migration plans are written as workload waves and tested as workload waves, and then they slip because a circuit upgrade needed a router that is twelve weeks out, or because two hundred desks still have machines that cannot reach the new environment cleanly. The hardware residue of a cloud migration is predictable — edge and branch gateways, a WAN refresh, staging storage large enough to hold a seed copy, replacement endpoints, and an access layer for the users who move first. Uniqcli quotes that layer as one bill of materials, screens every line for country of origin and §889, and stages it in the order it will be installed. The migration itself is run by your team or your integrator; we make sure they are not waiting on a box.
The four things that actually hold up a wave
Verified catalog lines, not a reference architecture. Naming a manufacturer describes the market, not a Uniqcli partnership or endorsement.
Branch and edge connectivity
Peplink gateways for sites where the circuit is the constraint and a bonded or failover path is the honest answer, quoted per site with the antenna and mounting hardware on the same line.
Switching and campus refresh
Allied Telesis switching across access and aggregation, priced deeply on this catalog. Migrations expose the switch that was never going to carry the new traffic profile — this is where it gets replaced.
Boundary enforcement
SonicWall appliances and their subscription terms, quoted against the renewal date rather than the purchase date, for the new perimeter a hybrid estate needs on both sides of the cutover.
Staging storage and seed copies
Nexsan arrays and drive cabinets for the seed copy, the rollback copy and the data set that is too large for the circuit you have. Sized against real bitrate and retention, not a headline capacity.
How the hardware layer gets ordered
The point of staging is that site forty installs the way site three did.
- Send the wave plan, the site list and the current estate — a spreadsheet is fine
- Long-lead lines are identified first and quoted with the date, not an estimate
- Endpoints and access devices are imaged and enrolled before they leave
- Each site's kit is labeled and crated to the site plan, not to the packing list
- Country of origin recorded per line; NDAA §889 screening before the quote goes out
- Replaced equipment is returned or retired under your own disposition policy
What we do not sell here
There is no Uniqcli migration service, no discovery-and-assessment engagement, and no cutover we run on your behalf. Migration tooling vendors have no priced inventory on this catalog, so where you need one we will say it is sourced on request through authorized US distribution rather than pretending to a line we cannot fill.
What we do is capability-level and specific: configuration to your build sheet, imaging and enrollment, asset tagging, kitting per site, and delivery sequenced to the installation calendar. We source and integrate the technology; the platform, the tenancy and the day-to-day operation stay with you or with the provider you have chosen.
Migration hardware questions
Can you run the migration for us?
No. We supply, configure and stage the hardware a migration consumes, and we sequence delivery to your wave plan. The migration itself — discovery, dependency mapping, cutover, rollback — is executed by your team or the integrator you have engaged.
We only know the site count, not the bill of materials. Is that enough to start?
Yes. A site list, a rough user count per site and the current circuit type is enough for a first pass. We come back with a per-site kit, the long-lead items flagged, and the questions that would change the answer.
Do you take the old equipment away?
We coordinate return logistics alongside the delivery. Disposition — wipe standard, resale, destruction, property-book removal — stays a decision your organization makes and documents; we work to the policy you give us.
The solutions atlas
Every solution, one accountable partner.
UniQ platforms
By technology
By customer
- TAA & NDAA-889 Compliance Screening
- CMMC & CUI Solutions
- Federal & DoD
- State, Local & Education
- Healthcare
- Enterprise
- Rapid Procurement & GPC Buys
- Multi-Vendor Integration Projects
- eProcurement & Custom Catalogs
- FISMA Modernization
- CJIS-Compliant Justice Cloud & Local AI
- Federal Storage Modernization
- Government ERP & Business Systems Infrastructure
- Managed Procurement
- Secure AV & Conferencing
- Fiber Network Infrastructure
- Satellite & Resilient Connectivity
- Wavelength & Optical Transport
- Decentralized Data Centers
- Data Center Design & Build
Send the wave plan
We return a per-site bill of materials with lead times on every line and the long-lead items called out first.