Vertiv rack PDUs in stock at Uniqcli

How to choose →

A curated selection with live pricing — in-stock lines first, then back-ordered lines with a typical lead time. Every line is sourced through authorized distribution and screened for TAA country-of-origin and NDAA §889 status before checkout.

Browse all 4,131 PDUs

Not the right one above? Filter the whole range by the specs that matter — live pricing and honest availability on every row, and the same TAA country-of-origin and NDAA §889 screening before checkout.

Showing 24 of 4,131 PDUs

Browse the full catalog

Specifications are read from the manufacturer product title as supplied to us; where a value is not stated it is left blank rather than estimated. Every line is screened for TAA country-of-origin and NDAA §889 status before checkout.

Need pricing on Vertiv rack PDUs?

Tell us where to reach you and a Uniqcli specialist will follow up by email with current pricing, availability and lead time for the quantities you need — including parts that aren’t shown on this page.

Buying for an organization or for yourself — both work. No payment up front.

Do not submit classified information, CUI, restricted FCI, export-controlled technical data, protected health information, payment-card data, passwords, or private keys through this form. Contact your Uniqcli representative or [email protected] to request an approved channel.

Vertiv's Geist rack PDU line covers the four tiers that decide what you can see and control at the rack: basic (power only), metered (input-level current readings to avoid overloading a circuit), monitored/unit+outlet (per-outlet visibility for capacity planning and billing), and switched (remote on/off/reboot of individual outlets). Choosing the tier is the main decision — it sets how much you can manage the rack remotely.

The physical fit matters just as much: confirm the input plug and phase (single vs. three-phase), the outlet mix (C13/C19 count), and whether you need a 0U vertical strip or a horizontal 1U/2U unit for the rack. The Vertiv PDUs below are the models Uniqcli currently stocks, with in-stock status on each card.

Buyer's checklist

How to choose a Vertiv PDU

  • Pick the intelligence tier: basic for simple power, metered to prevent circuit overload, monitored for per-outlet capacity data, switched for remote outlet control/reboot.
  • Match input plug, voltage and phase (single vs. three-phase) to the circuit feeding the rack.
  • Count the outlet types you need (C13 vs. C19) and confirm the strip provides enough of each.
  • Choose 0U vertical for dense racks (keeps horizontal U free) or horizontal 1U/2U where rear space is limited.
  • For monitored/switched units, confirm the network interface and that it fits your DCIM/monitoring stack.
  • Verify the total rack load stays within the PDU and upstream breaker rating with headroom.

Where each PDU tier fits

The intelligence tier usually tracks the site's staffing and criticality. Basic strips are fine for a lab bench or a spare rack someone can walk to; metered units belong anywhere a circuit could be overloaded by accretion, giving you an input reading before a breaker trips. Monitored, outlet-level PDUs earn their place in production data-center and colocation racks where per-outlet data feeds capacity planning and cost allocation, letting you see stranded capacity rather than guess at it.

Switched PDUs come into their own at unattended and edge locations — network closets, remote IDFs, small edge racks — where power-cycling a hung device remotely replaces a truck roll or a late-night drive. The further a rack sits from your on-site staff, the more a switched or monitored unit justifies its premium, because the alternative is someone physically standing in front of it.

Designing rack power for redundancy and capacity

Resilient racks are usually fed A and B from separate circuits and, ideally, separate upstream UPS paths, with dual-corded equipment split across the two so either feed can carry the load during maintenance. On three-phase strips, spread high-draw devices to keep the phases balanced rather than loading one leg. Size every circuit so normal draw leaves headroom under the breaker rating — inrush and growth both eat into a strip that's provisioned to the edge.

Monitored and switched units add a network interface, so treat them as managed devices: put them on the management VLAN, keep firmware current, and change default credentials before they go live. Many Vertiv Geist units accept environmental sensors for inlet temperature and humidity, which is worth wiring during the build rather than retrofitting later. Confirm the interface and data format line up with your DCIM or monitoring stack so the readings actually land somewhere useful.

Total cost of ownership

A PDU's purchase price is minor next to the cost of the outages and stranded capacity that visibility prevents. Metered and monitored strips let you load circuits closer to their real limit with confidence, reclaiming capacity that would otherwise sit idle as a safety margin, while per-outlet data supports internal billing and cleaner capacity forecasts. Switched units pay back in avoided truck rolls at remote sites — one prevented dispatch can offset the difference over a basic strip.

Plan for the operational life, not just the install. Firmware support, network security for the managed units, and spares for a standardized model keep a fleet maintainable over years in service. For federal and enterprise data-center projects, every unit Uniqcli quotes is sourced through authorized distribution and screened for TAA country-of-origin and NDAA §889 status against its specific part number, with documentation for compliance review.

FAQ

Common questions

What's the difference between metered, monitored and switched PDUs?
Metered PDUs report current draw at the PDU input so you don't overload a circuit. Monitored (outlet-metered) PDUs add per-outlet readings for capacity planning and cost allocation. Switched PDUs add remote control — you can power-cycle an individual outlet from anywhere, which is valuable for unattended or edge sites. Higher tiers cost more but reduce truck rolls and overload risk.
How do I choose between a 0U and a horizontal PDU?
0U vertical PDUs mount in the rack's rear channels and don't consume rack units — the usual choice for dense server racks. Horizontal 1U/2U PDUs are easier to reach and fit network/patching racks or shallow enclosures where the vertical channel is obstructed. Match the choice to how full the rack is and where your cabling runs.
Can Vertiv PDUs be quoted for a federal data-center project?
Every line Uniqcli quotes is sourced through authorized distribution and screened for TAA country-of-origin and NDAA §889 status before checkout — with documentation tied to the specific part number, not a product family.
Ask AI about Uniqcli

Best barcode scanners

Need Vertiv rack PDUs pricing?

Send a bill of materials or part numbers — we confirm stock, TAA country of origin and a below-market total. No payment up front.