Best Panduit PDUs for Data Center Racks
Monitored, switched and per-outlet-metered rack PDUs — SmartZone G5 and G6 families in 0U vertical form factors for high-density cabinets.
Panduit PDUs at Uniqcli
How to choose →A curated selection with live pricing and honest availability — everything below is currently back-ordered, and we quote a dated lead time on request. Every line is sourced through authorized distribution and screened for TAA country-of-origin and NDAA §889 status before checkout.
- PANDUITPanduit P12B01M Horizontal Basic Power Distribution Unit - Basic - NEMA 5-15P - 12 x NEMA 5-20R - 120 V AC - 1U - Horizontal - Rack-mountableP12B01M
$159.44
$128.23
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit P12B46M Horizontal Power Distribution Unit - Basic - NEMA L6-20P - 12 x IEC 60320 C13 - 230 V AC - 1U - Horizontal - Rack-mountableP12B46M
$197.64
$158.95
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit P12B19M Horizontal Basic Power Distribution Unit - Basic - NEMA 5-20P - 12 x NEMA 5-20R - 120 V AC - 1U - Horizontal - Rack-mountableP12B19M
$204.90
$164.80
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit G5 12-Outlets PDU - Basic - IEC 60309 2P+E 6h 16A (IP44) - 12 x IEC 60320 C13 - 230 V AC - 10 ft Cord Length - 1U - Rack-mountable - HorizontalP12B34M
$216.86
$173.94
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit P12B30M Horizontal Basic Power Distribution Unit - Basic - NEMA L5-20P - 12 x NEMA 5-20R - 120 V AC - 1U - Horizontal - Rack-mountableP12B30M
$225.87
$181.18
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit P16B04M Vertical Basic Power Distribution Unit - Basic - NEMA 5-15P - 16 x NEMA 5-20R - 120 V AC - 0U - Vertical - Rack-mountableP16B04M
$247.16
$198.24
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit P16B07M Vertical Basic Power Distribution Unit - Basic - NEMA 5-20P - 16 x NEMA 5-20R - 120 V AC - 0U - Vertical - Rack-mountableP16B07M
$261.04
$209.39
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit P16B08M Vertical Basic Power Distribution Unit - Basic - NEMA L5-20P - 16 x NEMA 5-20R - 120 V AC - 0U - Vertical - Rack-mountableP16B08M
$287.46
$230.58
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit P12B47M Horizontal Power Distribution Unit - Basic - NEMA L6-30P - 12 x IEC 60320 C13 - 230 V AC - 1U - Horizontal - Rack-mountableP12B47M
$328.36
$263.38
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit P22B10M Vertical Basic Power Distribution Unit - Basic - NEMA L6-20P - 20 x IEC 60320 C13, 2 x IEC 60320 C19 - 208 V AC - 0U - Vertical - Rack-mountableP22B10M
$336.59
$269.98
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit G5 12-Outlets PDU - Basic - IEC 60309 2P+E 6h 32A (IP44) - 12 x IEC 60320 C13 - 230 V AC - Overload Protection - 10 ft Cord Length - 1U - Horizontal - Rack-mountable - Rack, Horizontal, CompactP12B36M
$351.37
$281.85
Back-orderedBack-ordered · est. available by September 10, 2026
- PANDUITPanduit P16B41M Horizontal Power Distribution Unit - Basic - NEMA L5-30P - 16 x NEMA 5-20R - 120 V AC - 2U - Horizontal - Rack-mountableP16B41M
$373.69
$297.38
Back-orderedBack-ordered · est. available by September 10, 2026
Browse all 4,131 PDUs
Not the right one above? Filter the whole range by the specs that matter — live pricing and honest availability on every row, and the same TAA country-of-origin and NDAA §889 screening before checkout.
Showing 24 of 4,131 PDUs
- EatonEaton 7.7kW Single-Phase Switched PDU with LX Platform Interface, 230V Output, IEC 309 32A Blue, 10 ft. (3.05 m) Cord, 0U, TAA - Switched - 4 x IEC 60320 C19, 20 x IEC 60320 C13 - 230 V AC - Network (RJ-45) - 0U - Vertical - Rack Mount - Rack-mountable - TAA CompliantPDUMV32HVNETLX
$1,602.00
$999.14
129 in stock - LegrandMiddle Atlantic NEXSYS Rack Mount Power Distribution Unit - 20 Amp, 9 Outlet Rack Mount PDU - Rack-mountable - RackPDX-920R
$482.00
$275.43
353 in stock - EatonTripp Lite by Eaton PDU 1.44kW 120V Single-Phase ATS/Local Metered PDU - 8 NEMA 5-15R Outlets Dual 5-15P Inputs 12 ft. Cords 1U TAA - Metered Auto Transfer Switch - NEMA 5-15P - 8 x NEMA 5-15R - 120 V AC - 1U - Horizontal - Rack-mountable, Wall-mountable - TAA CompliantPDUMH15ATS
$644.00
$414.75
208 in stock - CyberPower SystemsCyberPower PDU15MHVIEC8FNET 200 - 240 VAC 15A Monitored PDU - 8 Outlets, 10 ft, IEC-320 C14, Horizontal, 1U, SNMP, 3YR WarrantyPDU15MHVIEC8FNET
$319.00
$239.21
3 in stock - EatonEaton Universal-Input Basic PDU G4, 208V and 415/240V, 42 Outlets, Input Cable Sold Separately, End-Entry Input, 72-Inch 0U Vertical - Basic - Universal Input - 24 x IEC 60320 C13, 18 x IEC 60320 C39 - Network (RJ-45) - 0U - Vertical - Rack-mountable - VerticalEVBAGU23X-E
$1,793.52
$1,440.52
503 in stock
Specifications are read from the manufacturer product title as supplied to us; where a value is not stated it is left blank rather than estimated. Every line is screened for TAA country-of-origin and NDAA §889 status before checkout.
Need pricing on Panduit PDUs?
Tell us where to reach you and a Uniqcli specialist will follow up by email with current pricing, availability and lead time for the quantities you need — including parts that aren’t shown on this page.
Buying for an organization or for yourself — both work. No payment up front.
Panduit builds intelligent rack power distribution around two families — the SmartZone G5 and the newer G6 — both aimed at high-density data-center and network cabinets rather than desktop or wall use. Most are 0U vertical PDUs that mount in the cabinet's zero-U channel, freeing rack units for equipment, and the line spans single- and three-phase, with three-phase units built to feed a full column of servers, switches or storage from a single drop.
Choosing the right variant comes down to a few decisions. First, the input: Panduit spans NEMA locking (L15-30P, L21-30P), CS8365 and IEC 60309 plugs across 208V, 230V and 415V, and the receptacle has to match the whip already in your cabinet. Second, the intelligence tier — Monitored units report current so you can see load; Switched units add remote outlet on/off for reboots and staging; Monitored & Switched Per Outlet (MSPO) units add per-outlet metering for chargeback and stranded-capacity analysis. Third, the outlet mix: count how many high-draw C19/C21 versus standard C13/C15 receptacles your equipment actually needs.
The most common mistakes are ordering an input plug that doesn't match the cabinet drop, sizing to nameplate amperage instead of the 80% continuous-load derate, and buying more intelligence than the team will use — or too little to meet a monitoring requirement. The selection below is what Uniqcli currently stocks, with live in-stock status shown on each item; many rack PDUs are configured to order, so if a specific input, voltage or outlet count isn't listed we can source it against your part number.
Buyer's checklist
What to check before you buy
- Match the input plug to your rack whip — Panduit offers NEMA L15-30P/L21-30P, CS8365 and IEC 60309 3P+N+E/3P+E inputs, and the PDU receptacle must match the drop already in the cabinet.
- Size amperage and phase to the load — single- vs three-phase and the branch rating (e.g., 20/30/60A) set usable capacity; plan to the 80% continuous-load derate, not the nameplate.
- Pick the intelligence tier you'll actually use — Monitored reports input/branch current, Switched adds remote outlet control, and Monitored & Switched Per Outlet (MSPO) adds per-outlet current for billing and capacity work.
- Confirm the outlet mix — count C13/C15 against C19/C21 receptacles versus your server and switch cords so you aren't short on high-draw C19 positions.
- Verify voltage matches your distribution — 208V, 230V and 415V variants exist, and the wrong voltage class won't fit your PDU/UPS topology.
- Plan the 0U mounting and network path — vertical units use the cabinet's button-mount channel, and intelligent models need an RJ-45 drop to the management network.
Where SmartZone rack PDUs fit
These aren't lobby or workbench strips — they belong inside the cabinet. In colocation cages and enterprise server rooms, a pair of three-phase 0U units feeds the A and B power for a full column of dual-corded servers, switches and storage. In network and edge closets, a single-phase monitored unit is often enough. Facilities and data-center operations teams standardize on them so every cabinet in a row reports load the same way.
The intelligence tier should track how the space is run. A lights-out cage benefits from switched or MSPO units so a remote hand can power-cycle a hung device or stage a new server without a site visit, while a closet a technician passes daily may only need monitored current readings. Mapping the tier to how often people actually touch the rack keeps you from over-buying capability nobody uses or under-buying past a monitoring requirement.
Planning a rack-power rollout
Treat a PDU deployment as a fleet exercise, not a cabinet-by-cabinet purchase. Lock the input plug, phase and branch rating to your electrical drawings first, then standardize one intelligence tier across the row so the monitoring data stays uniform. Every intelligent unit needs an RJ-45 drop, so plan the management VLAN, IP scheme and any DCIM or gateway integration before install — that way the cabinets come online reporting load on day one.
Balance load across phases and across the A and B feeds as you populate outlets, not afterward. An unbalanced three-phase unit strands capacity and complicates the redundancy math. Keep the 80% continuous-load derate as genuine headroom rather than reserve you intend to consume, so a failover onto a single feed during maintenance or an outage doesn't trip a branch breaker and take the cabinet down.
The total cost picture beyond the unit
The purchase price is the smallest line in a rack PDU's working life. Per-outlet metering on MSPO models pays back by exposing stranded capacity — power you've provisioned but aren't drawing — so you can defer new-circuit or new-cabinet spend. Remote outlet switching removes truck rolls for reboots and staging, and uniform monitoring shortens the time to find an overloaded circuit before it trips. Weigh those operational savings against the tier premium.
Plan for a multi-year service life. Intelligent PDUs receive firmware updates, and standardizing on one SmartZone generation keeps management tooling, spares and technician training consistent across refresh cycles. Where a row mixes G5 and G6 generations, budget the extra tooling overhead that split creates. Matching the generation to the fleet you already run is usually cheaper over time than mixing platforms to chase a marginal per-unit saving.
FAQ
Common questions
- What's the difference between monitored, switched and per-outlet-metered Panduit PDUs?
- Monitored units report input and branch current so you can see load and headroom. Switched units add that plus remote outlet on/off for reboots and staging. Monitored & Switched Per Outlet (MSPO) units go further with per-outlet current metering, which is what you want for chargeback, capacity planning and finding stranded power.
- How do I choose the right input plug and voltage?
- Match the PDU to the whip already terminated in your cabinet. Panduit offers NEMA locking (L15-30P, L21-30P), CS8365 and IEC 60309 3P+N+E/3P+E inputs across 208V, 230V and 415V. Confirm the receptacle type, phase and branch amperage with your electrical drawings before ordering, since the input is fixed on the unit.
- What's the difference between the SmartZone G5 and G6 families?
- G6 is Panduit's newer-generation intelligent rack PDU platform and SmartZone G5 is the prior generation. Both share the 0U vertical form factor and the monitored, switched and per-outlet-metered tiers, so the practical choice usually comes down to which generation matches your existing fleet, management tooling and standardization.
- Can these be purchased on a government or education contract?
- Yes. These Panduit PDUs are available to business, government and education buyers. Every unit is sourced through authorized distribution and screened for TAA country-of-origin and NDAA Section 889 status before checkout, with documentation tied to the specific part number so your procurement and compliance teams can confirm it against their own requirements. We can align an order to the contract or purchasing process your organization already uses; the screening we provide is a sourcing service, not an independent Uniqcli certification.
Need Panduit PDUs pricing?
Send a bill of materials or part numbers — we confirm stock, TAA country of origin and a below-market total. No payment up front.




































